![](http://www.gercon.com.br/site/wp-content/uploads/2019/12/logomultirio-1.png)
Place:
Multi-Rio Terminal – Port of Rio de Janeiro – RJ
Work:
Port Infrastructure Work – Extension for the Portainer Lines
Area:
2.800 m²
Multi-Rio Terminal – Port of Rio de Janeiro – RJ
Port Infrastructure Work – Extension for the Portainer Lines
2.800 m²